
Battery Cabinet Installation Plan and Unpacking
2-3
EATON
Powerware
®
9390 Integrated Battery Cabinet (Models IBC-S and IBC-L) Installation Manual
S
164201536 Rev D
www.eaton.com/powerquality
2.4 Inspecting and Unpacking the Battery Cabinet
The next step is inspecting and unpacking the battery cabinet. The cabinet is shipped
bolted to a pallet consisting of four angle metal supports secured to two four-inch by
six-inch wood supports, as shown in Figure 2‐1, and protected with outer protective
packaging material.
Figure 2‐1. Powerware 9390 Battery Cabinet as Shipped on Pallet (Model IBC-L shown)