Definitions

EVSE

—Electric Vehicle Supply Equipment . EVSE is a 

general term used for all of the equipment used to supply 

electricity to the car .

J1772

—SAE Recommended Practice for conductive charg-

ing of hybrid and electric vehicles . This standard spells out 

the physical dimensions of the J1772 connector and the 

pilot communication between the plug-in vehicle and the 

EVSE .

Pilot

—The communication signal through the J1772 

connector . This signal tells both the vehicle and the EVSE 

when both are ready to charge and how much current is 

permitted in the circuit . This signal is part of the SAE J1772 

standard .

SAE

—Society of Automotive Engineers . The group that 

organizes and leads committees of transportation experts 

to create standards, such as J1772, for the transportation 

industry .

ADA

—Americans with Disabilities Act .

UL

®

—Underwriters Laboratories . UL is an accredited stan-

dards developer in the U .S . and Canada .

Moving, transporting, and storage instructions

Store the equipment indoors and in its original packaging 

until it is ready to be installed . Storage temperature should 

be between –40 °C and +60 °C . Never attempt to lift, move, 

or carry the equipment by the EV connector cord or power 

cord . Improper storage or handling may cause damage to the 

equipment .

 WARNING

ONLY QUALIFIED PERSONNEL FAMILIAR WITH THE OPERATION 

AND CONSTRUCTION OF THIS EQUIPMENT SHOULD INSTALL, 

ADJUST, MODIFY, AND SERVICE THIS EQUIPMENT. FAILURE TO 

FOLLOW THE INSTRUCTIONS COULD RESULT IN SEVERE BODILY 

INJURY OR DEATH.  

NOTICE

THE USER IS RESPONSIBLE FOR CONFORMING TO ALL LOCAL AND 

NATIONAL ELECTRICAL CODES AND STANDARDS APPLICABLE IN 

THE JURISDICTION IN WHICH THIS EQUIPMENT IS INSTALLED. 

NEC Article 625 requires that the coupling means of the 

electric vehicle supply equipment shall be stored or located 

at a height of not less than 18 inches (450 mm) and not 

more than 4 ft (1 .2 m) above the floor level for indoor loca-

tions and 24 inches (600 mm) above the grade level for 

outdoor locations .

WARNING – Risk of Explosion .  This equipment has arcing 

or sparking parts that should not be exposed to flammable 

vapors .  This equipment should be located at least 18 inches 

(460 mm) above the floor .

Americans with Disabilities Act requirements to 

consider for workplace charging installation

The ADA and workplace charging 

The Americans with Disabilities Act (ADA) is a federal civil 

rights law that prohibits discrimination in public places 

against individuals with disabilities . As an employer installing 

plug-in electric vehicle (PEV) charging stations, also known 

as electric vehicle supply equipment (EVSE), you need to 

follow special design guidelines to accommodate people 

with disabilities, as required by the ADA . Although the ADA 

does not provide design standards for charging station-

equipped parking spots, several industry studies and PEV 

planning guides do . In addition, several plans developed 

under the U .S . Department of Energy’s (DOE) Clean Cities 

EV Community Readiness projects describe best practices 

for installing ADA-compliant charging stations .

Best practices for designing ADA-compliant  

PEV charging stations 

When designing ADA-compliant PEV charging stations, 

consider accessibility, ease of use, and safety for disabled 

drivers, including those using wheelchairs or other assistive 

equipment . Key considerations include ensuring adequate 

space for exiting and entering the vehicle, unobstructed 

access to the EVSE, free movement around the EVSE and 

connection point on the vehicle,  

as well as clear paths and close proximity to any building 

entrances . 
For information about the ADA, including the revised  

2010 ADA regulations, please visit the Department’s 

website: 

http://www.ada.gov

; or, for answers to specific 

questions, call the toll-free ADA information line at 800-514-

0301 (voice) or 800-514-0383 (TTY) .

48” max

15” min

10” max

48” max

34” max

10” max

48” max

15” min

48” max

15” min

10” max

48” max

34” max

10” max

48” max

15” min

48” max

15” min

10” max

48” max

34” max

10” max

48” max

15” min

Summary of Contents for Green Motion Fleet

Page 1: ...Installation guide Green Motion Fleet Green Motion Building Green Motion chargers...

Page 2: ...ALLATION Safety information 3 General reference 4 A Preparing the EV charger s 5 B Mount an EV charger to a wall 6 C Mount an EV charger to a pedestal 9 D Mount a second EV charger to a pedestal 15 FC...

Page 3: ...Green Motion chargers AC Level 2 deliver fast and cost effective charging for passenger vehicles and medium duty trucks used for last mile delivery Combining breakout capabilities for metering control...

Page 4: ...ehicle connected EVSE ready Long Blue Short Blue No Blink Blue Long Red Vehicle charging state EVSE not ready 1 Charging Fault 2 No Blink Green Medium Blue Vehicle connected Idle Ready READY CHARGE FA...

Page 5: ...G IN ELECTRIC VEHICLES ONLY PREMISE VENTILATION NOT REQUIRED THIS DEVICE SHOULD BE SUPERVISED WHEN USED AROUND CHILDREN WARNING TURN OFF OR DISCONNECT THE POWER SUPPLYING THIS EQUIPMENT BEFORE BEGINNI...

Page 6: ...and not more than 4 ft 1 2 m above the floor level for indoor loca tions and 24 inches 600 mm above the grade level for outdoor locations WARNING Risk of Explosion This equipment has arcing or sparkin...

Page 7: ...ar of the charger and then remove the front cover 2 Unscrew the two bolts 1 on the side of the adapter plate and remove the plate 2 Set the bolts aside for now If a SIM card is not needed then skip th...

Page 8: ...Section C Reference 1 Adapter plate 2 M6 screws x4 3 Anchor x4 Reference 1 EV charger 2 Adapter plate 3 Bolts x2 B Mount an EV charger to a wall Use the adapter plate 1 as a template mark the hole pat...

Page 9: ...to the junction box and connect inside the junction box Suggest using the Polaris lugs provided in the kit for wiring inside the junction box Secure the cover of the junction box 4 STEP B 5 1 4 3 2 F...

Page 10: ...tor assembly 2 STEP B 7 Reference 1 1 2 trade size conduit 2 Connector assembly 3 Ethernet port 4 EV charger Optional Assemble the custom Ethernet adapter connector 1 the 1 2 o ring 2 and the 1 2 NPT...

Page 11: ...ments Reconnect power to the upstream circuit by switching circuit breaker to the ON position Energize the loadcenter or the panelboard The EV charger electronics should power immediately and the LCD...

Page 12: ...e with the EV pedestal With that hardware install the premium cord holster 3 onto the pedestal using 1 4 20 hex head bolts washers and serrated flange nuts 4 Install the adapter plate 5 onto the front...

Page 13: ...embly 4 onto the lineside conductors 5 and up into the EV charger 6 where it press fits Feed the lineside conductors 1 through the opening in the pedestal and through the 1 conduit locknut 2 Insert th...

Page 14: ...e conduit 5 into the assembly 6 STEP C 8 Reference 1 Ethernet cable 2 1 2 plastic nut 3 Small opening in EV pedestal 4 1 2 NPT 90 degree adapter 5 10 5 conduit 6 Connector assembly 7 Ethernet port Opt...

Page 15: ...ired lengths and connect them with their respective power cables using two Polaris lugs 1 Install a ring terminal on the EV charger ground conductor and connect it to the pedestal ground stud 1 Secure...

Page 16: ...stal then skip to Section D Reconnect power to the upstream circuit by switching circuit breaker to the ON position Energize the loadcenter or the panelboard The EV charger electronics should power im...

Page 17: ...to the pedestal 2 using the ten speed screws 3 Install the last bolt washer and nut 4 to the plate assembly Repeat Steps C 3 through C 11 to mount the second EV charger STEP D 1 STEP D 2 Reference 1 B...

Page 18: ...le access panel 3 1 4 20 hex head bolts 1 4 washers 1 4 20 locknuts 4 Mid panel assembly 5 Lower access panel 6 EV pedestal 7 10 speed screws STEP D 4 STEP D 5 Reconnect power to the upstream circuit...

Page 19: ...ourself If the unit requires servicing please contact Eaton customer service The installation maintenance and servicing of your EV charger must only be performed by qualified personnel in accordance w...

Page 20: ...material for three 3 year from the date of original purchase In the event any Product fails to comply with the foregoing warranty Seller will at its option either a repair or replace the defective Pro...

Page 21: ...he EV charger will timeout and authentication failed messgae is displayed Contact a certified electrician to make sure the RFID module is not disconnected from the main EV charger electronics Why is t...

Page 22: ...trademark All trademarks are property of their respective owners Eaton 1000 Eaton Boulevard Cleveland OH 44122 United States Eaton com 2022 Eaton All Rights Reserved Printed in USA Publication No IL1...

Reviews: