12
Green Motion Fleet & Green Motion Building
GREEN MOTION FLEET & BUILDING
www.eaton.com
Steps C-7 through C-9 are optional: RJ45 (Ethernet) cable wiring
!
Feed an Ethernet cable
(1)
through the 1/2” plastic
nut
(2)
, and the small opening in the EV pedestal
(3)
.
Feed the Ethernet cable through the 90-degree
NPT adapter
(4)
, 10 .5” conduit
(5)
, and connector
assembly
(6)
.
Plug the Ethernet cable into the port
(7)
on the
EV charger .
Screw the connector assembly
(6)
to the EV charger .
Push the conduit
(5)
into the assembly
(6)
.
STEP C-8
Reference:
1
.
Ethernet cable
2
.
1/2” plastic nut
3
.
Small opening in EV pedestal
4
. 1/2” NPT 90 degree adapter
5
.
10.5” conduit
6
.
Connector assembly
7
.
Ethernet port
Optional
1
2
6
4
5
3
Assemble the custom Ethernet adapter connector
(1)
,
a 1/2” o-ring
(2)
, and the 1/2” NPT conduit straight
adapter
(3)
together as a unit .
Place a 1/2” o-ring
(2)
onto the threaded end
of the 1/2” NPT 90 degree adapter
(4)
.
Remove the Ethernet port cap
(5)
on the EV charger
(6)
.
STEP C-7
Reference:
1
.
Custom Ethernet adapter connector
2
.
1/2” o-ring
3
.
1/2” NPT conduit straight adapter
4
.
1/2” NPT 90 degree adapter
5
.
Cap
6
.
EV charger
3
2
1
Optional
2
4
5
6
B6 Main
7
5
6