background image

I.L. 16913A

Effective July 2007

2

Fig. 1

A. Power switching contacts which close or open 

to connect or disconnect the load circuits to the 
respective power sources.

B. Transfer mechanism which functions to drive the

power switching contacts to the appropriate 
positions.

C. Intelligence circuitry which monitors the 

condition of the power sources and makes 
transfer operation decisions.

A separate instruction manual is always provided for
the ATS Controller of this equipment only. The
user/installer should read and thoroughly understand
this separate document in conjunction with this
manual before proceeding with installation and
operation of the ATSBI equipment.

2. Isolation Switch and Operating Mechanism

The isolation contacts are load break switches which
when actuated by means of the isolation

mechanism operating handle, disconnect all power
to the ATS   power switching contacts. This allows
the isolated ATS to be inspected or maintained with
all power disconnected.

3. Bypass Switched

The bypass switch permits power continuity to
critical load circuits while the ATS is isolated. Normal
and emergency bypass switches are provided to
permit bypass to either power source, but both
bypass switches are interlocked with the isolation
switch to positively prevent inadvertent paralleling of
sources.

INSTALLATION

Cutler-Hammer ATSBI Switches are factory wired
and tested. Installation simply requires mounting
and connecting of power cables (or bus), engine
start signal wires, and auxiliary control circuits (if
required).

MOUNTING

Remove all packing materials from the unit including
any internal shipping braces.

Inspect the unit thoroughly for obvious shipping
damage or deformation. Protect the unit from
construction grit and metal chips during the
installation process.

Lifting eyes are provided with the unit to facilitate
handling. If not already in place, assemble lifting
eyes to top of enclosure using hardware provided
with eyes. DO NOT attempt to lift unit by any means
other than lifting eyes. Lifting by other means can
result it damage to equipment. All metal subpanels
must remain in place prior to lifting equipment into
place via lifting eyes.

The floor mounted unit must be mounted straight
and square on a flat and level floor surface.

If bottom cable entry is required, conduit stubs must
be appropriately positioned in prepared mounting
pad prior to installation of unit. 

Bypass

Isolation

ATS

Summary of Contents for Cutler-Hammer BIHI

Page 1: ...IN INTERLOCKS AND SAFETY FEATURES INTENDED TO PROVIDE SAFE AND PROPER OPERATING SEQUENCES TO PROTECT PERSONNEL ASSOCIATED WITH THE INSTALLATION OPERATION AND MAINTENANCE OF THIS EQUIPMENT THE FOLLOWI...

Page 2: ...ontacting the factory for technical support A ratings nameplate will also be affixed to the switch identifying the withstand interrupting and closing ratings for which the unit is intended DO NOT APPL...

Page 3: ...ency bypass switches are provided to permit bypass to either power source but both bypass switches are interlocked with the isolation switch to positively prevent inadvertent paralleling of sources IN...

Page 4: ...Effective July 2007 3 I L 16913A Fig 2 Note For bottom entry add 14 to depth of unit...

Page 5: ...4 24 610 Single Phase Only DIMENSIONS INCHES MM BYPASS ISOLATION ATS 2 3 POLE DIMENSIONS INCHES MM BYPASS ISOLATION ATS 4 POLE Max Max Switch CSA Amps Volts Frame Bypass Frame A B C D E F G H I J 150...

Page 6: ...or ringing of the conductor strands Prepare stripped conductor termination end by cleaning with a wire brush If aluminum conductors are used apply an appropriate joint compound to the clean conductor...

Page 7: ...ition Connect the engine start wires to the RED terminal blocks marked 51A and 52A A contact closes between these terminal blocks when an engine start signal is provided by either the ATS or Bypass lo...

Page 8: ...Effective July 2007 7 Fig 3 I L 16913A...

Page 9: ...Effective July 2007 Supercedes I L 16913 dated February 1991 8 I L 16913A Fig 3...

Page 10: ...position if not already in normal This DOES NOT indicate a presence of voltage on the ATS power panel since the ATS logic panel senses on the line side of the Bypass switch Utilizing a voltmetre meas...

Page 11: ...osition the Generator control selector switch to the auto start position Additional functional load transfer tests may be desirable including automatic engine start operation See ATS Controller Manual...

Page 12: ...a downstream short circuit condition the ATS logic will engage the Transfer Mechanism to electrically reset the automatically opened switch If optional overcurrent protection option 16 17 or 37 is pro...

Page 13: ...us short circuit releases are replaced with conventional circuit breakers equipped with thermal elements in addition to magnetic releases to provide overload and short circuit protection to connected...

Page 14: ...ntenance agreements for our ATSBI product In most instances such maintenance agreements also extends warranty periods Contact your local Cutler Hammer Representative for more information on factory su...

Reviews: