A.1
Installation Checklist
o
All packing materials and restraints have been removed from each cabinet.
o
Adequate workspace exists around the MBC and other cabinets.
o
Adequate lighting is provided around all UPS system equipment.
o
Air conditioning equipment is installed and operating correctly.
o
Each cabinet in the UPS system is placed in its final installation location. The UPS and MBC must be
installed on a level floor suitable for computer or electronic equipment.
o
The MBC cabinet is bolted to the floor for permanent installations.
o
All conduits and cables are properly routed to the MBC.
o
All power cables are properly sized and terminated.
o
A ground conductor is properly installed.
o
MBC maintenance bypass aux contact signal wiring is connected from the MBC to the UPS.
o
The area around the UPS and MBC system is clean and dust-free.
o
OPTIONAL – Distribution panel branch circuit breakers are installed and wired to the load.
o
OPTIONAL – If MBC remote emergency power-off (REPO) switch is installed:
o
The REPO device is mounted in its installed location and its wiring is terminated in the UPS and MBC. The
REPO switch must be a latching–type switch with two sets dedicated contacts.
o
MBC remote emergency power-off (REPO) signal wiring is connected from the MBC to the REPO button.
o
Ensure that SEPARATE contact was used to wire the REPO to the UPS.