![Eaton BladeUPS none Installation And Operation Manual Download Page 17](http://html1.mh-extra.com/html/eaton/bladeups-none/bladeups-none_installation-and-operation-manual_3708108017.webp)
Installation Plan and Preparation
Eaton BladeUPS 12 kVA Maintenance Bypass Cabinet Installation and Operation Manual P-164000130—Rev 1
www.eaton.com/powerquality
2-3
CAUTION
l
Do not install a damaged cabinet. Report any damage to the carrier and contact your Eaton
service representative immediately.
l
Do not tilt the MBC more than 10
from vertical or the cabinet may tip over.
NOTE
Verify that the forklift is rated to handle the weight of the cabinet (544.31 kg/1200
lb).
To unpack the cabinet:
1.
Carefully inspect the outer packaging for evidence of damage during transit.
2.
Use a forklift to move the packaged cabinet to the installation site, or as close as possible, before
unpacking. Insert the forklift forks between the skids on the bottom of the unit.
3.
Set the pallet on a firm, level surface, allowing a minimum clearance of 3m (10 ft) on each side for
removing the cabinet from the pallet.
4.
Remove the protective covering from the cabinet.
5.
Remove the packing material, and discard or recycle in a responsible manner.
6.
Inspect the contents for any evidence of physical damage, and compare each item with the Bill of Lading.
If damage has occurred or shortages are evident, contact your Eaton service representative immediately
to determine the extent of the damage and its impact upon further installation.
NOTE
While waiting for installation, protect the unpacked cabinet from moisture, dust, and
other harmful contaminants. Failure to store and protect the MBC properly may void
your warranty.
Summary of Contents for BladeUPS none
Page 65: ......
Page 66: ...164201690 4 P 164000130 1...