Eaton BladeUPS 12 kVA Maintenance Bypass Cabinet Installation and Operation Manual P-164000130—Rev 1
www.eaton.com/powerquality
3-1
Chapter 3
Installation
This section describes the Eaton BladeUPS 12 kVA Maintenance Bypass Cabinet (MBC) installation, including:
l
Unloading and installing the MBC cabinet
l
Connecting power wiring
l
Establishing communication and signaling
l
Completing the installation checklist
3.1
Unloading and Installing the Cabinet
The MBC is installed as a standalone system. The term standalone refers to cabinets that are not physically
attached to the UPS, and are wired with external customer-supplied wiring.
The MBC must first be unloaded from the pallet with a forklift. Then, the cabinet should be moved to the
installation site and secured in a stabilized position.
3.1.1
Preliminary Installation Information
DANGER
This MBC and the UPS contain LETHAL VOLTAGES. All repairs and service should be performed
by AUTHORIZED SERVICE PERSONNEL ONLY. There are NO USER SERVICEABLE PARTS inside
the UPS.
WARNING
All wiring should be performed by a licensed electrician. Installation should be performed only by
qualified personnel.
WARNING
The MBC and BladeUPS rack should be completely isolated from all power sources prior to and
during installation of wiring and communication cards.
Refer to the following while installing the MBC:
l
See the Appendix for installation drawings and additional installation notes.
l
Do not tilt the cabinets more than 10
from vertical or the cabinet may tip over.
l
1066.8 mm (42 in.) space is required behind the cabinet.
l
Remove the conduit landing plates to add conduit landing holes, or remove knockouts, as required. Plate
material is 16 gauge steel (1.5 mm/0.060 in. thick).
l
The cabinets must be installed on a level floor suitable for computer or electronic equipment.
l
See Appendix A.3 “Specifications Diagram” for equipment weight and point loading.
l
Details about control wiring are provided in each procedure. See Appendix A.2 “Installation and Wiring
Diagram”to identify the control wiring terminations and top and bottom conduit landing areas.