UPS SYSTEM INSTALLATION
Eaton 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual
S
164201710 Rev 2
www.eaton.com\powerquality
4-14
Ground Terminals
AC Output to
Critical Load
Phase C (E8)
Phase A (E6)
Phase B (E7)
(E12)
Neutral
UPM Rectifier Input
Terminal Block
Phase C
(E11)
Phase A (E9)
Phase B
(E10)
AC Input to
UPS Bypass
(Ground terminal bus
can be relocated below.)
Alternate Ground
Terminal Bus Location
`
(See Figure 4‐10 for detail.)
Figure 4‐9. UPS Power Terminal Detail AA – Separate Rectifier Feed
AC Input to
UPM Rectifiers
Phase A (E1)
Phase C (E3)
Phase B (E2)
UPM 2
UPM 1
Figure 4‐10. UPM Rectifier Input Power Terminal Block Detail