INSTALLING OPTIONS AND ACCESSORIES
Eaton 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual
S
164201710 Rev 2
www.eaton.com\powerquality
5-14
NOTE
Setup of the Powerware Hot Sync CAN Bridge Card must be performed by an authorized Eaton
Customer Service Engineer. Contact an Eaton service representative to schedule a date.
9.
Install wiring between the SCM II terminal block TB2 and the monitoring
equipment. See Figure 5‐10 for terminal block location and Figure 5‐11 for
terminal assignments.
10.
Close the front door and secure the latch.
11.
If removed, reinstall the safety shield panel removed in paragraph 5.1, Step 5.
Secure with the retained hardware.
12.
If removed, reinstall the left front panel removed in paragraph 5.1, Step 4 and
secure with the retained hardware.
13.
Restart the UPS. See Chapter 7, “UPS Operating Instructions,” for startup
instructions.