UNDERSTANDING UPS OPERATION
Eaton 9395 Plus 1 UPS (225–275 kVA) Installation and Operation Manual
S
164201710 Rev 2
www.eaton.com\powerquality
6-10
NOTE
Callout letter
A
maps to Table 3‐6 on page 3-10. Callout letters
B
,
C
, and
D
map to Table 3‐5 on page 3-9.
NOTE
If the load requires a neutral, a bypass source neutral must be provided. If the load does not require a neutral and there is no neutral conductor
connected at the bypass input, a neutral to ground bonding jumper must be installed. DO NOT install both a source neutral and a bonding jumper.
Service Connector
E1,
E2,
E3
E6, E7,
E8, E12
UPS
CABINET
Backfeed
Contactor (K5)
AC Output to
Critical Load
E9, E10,
E11, E12
Static
Switch
AC Input to UPS
Rectifiers 3 Wire
A-B-C Rotation
AC Input to Bypass
3 or 4 Wire A-B-C
Rotation
Fuse
Battery
Converter
Inverter
Output
Contactor
(K3)
Fuse
Rectifier
Input
Contactor
(K1)
Battery Contactor (K2)
Fuse
Fuse
Fuse
UPM 1
Battery
Breaker
E4, E5
Battery
Converter
Inverter
Output
Contactor
(K3)
Fuse
Rectifier
Input
Contactor
(K1)
Battery Contactor (K2)
Fuse
Fuse
Fuse
UPM 2
Battery
Breaker
E4, E5
A
B
C
D
C
BATTERY SYSTEM
(Not supplied with the UPS)
BATTERY SYSTEM
(Not supplied with the UPS)
UPM 2
UPM 1
E1,
E2,
E3
A
X-Slot
Interface
48V Battery
Shunt Trip
Interface Board
Battery Aux
Remote EPO
Building Alarms
Alarm Relays
Figure 6‐7. UPS System – Separate Rectifier Feed, Separate Battery, Dual‐Feed Configuration