INSTALLATION INSTRUCTIONS
12
15JUN98 – 9B8948
Installing the FEED TRAY
Possible damage from electrostatic discharge.
ESD
[1] Remove the 4 NUTS and WASHERS from the
CONTROL BOX COVER.
[2] Insert the FILM SENSOR CABLE through the
hole in the top of the CONTROL BOX.
[3] Press the GROMMET on the CABLE into the hole
on the CONTROL BOX.
[4] Install the FEED TRAY on the CONTROL BOX
using the 4 NUTS and WASHERS. Do not tighten
the NUTS.
[5] Connect the FILM SENSOR CABLE to the CN07
CONNECTOR on the BOARD in the CONTROL
BOX.
[6] Pull the FEED TRAY towards the front of the
PROCESSOR.
[7] Tighten the NUTS.
Leveling the PROCESSOR
Important
The PROCESSOR must be leveled for correct operation.
[1] Place the LEVEL on the non-drive side of the PROCESSOR and adjust the LEVELING SCREWS if necessary.
[2] Place the LEVEL on the back of the PROCESSOR and adjust the LEVELING SCREWS if necessary.
Note
Do not loosen the LEVELING SCREWS excessively or they might fall out.
H164_0045GC
BOX
CONTROL
GROMMET
CN07
FEED TRAY
4 NUTS
4 WASHERS
CABLE
FILM SENSOR
H164_0045GCA
H164_0012BC
LEVELING SCREW
NUT
LOCKING
H164_0012BCA