Installing the PROCESSOR
9B8948 – 15JUN98
13
[3] Remove the tape from the SCREENS in the bottom of the DEVELOPER and FIXER TANKS.
[4] Check the RACKS for squareness. Use the Adjustments and Replacements Section of the SERVICE MANUAL
if necessary.
[5] Install all RackS and CROSSOVERS.
Note
Check that the clear EVAPORATION COVER is correctly installed and snapped into position on the DEVELOPER
RACK.
[6] Check that the MAIN GEAR on each RACK correctly engages the WORM GEARS.
[7] Close all of the DRAIN VALVES.
[8] Fill the DEVELOPER and FIXER TANKS on the
PROCESSOR with water until the water begins to
enter the OVERFLOW HOSES.
[9] Observe the depth of the water around the
RACKS. The ROLLERS should be uniformly
immersed in the solutions.
[10] If necessary, level the PROCESSOR using the
LEVELING SCREWS.
[11] Tighten the LOCKING NUT on each LEVELING
SCREW.
[12] Fill the DEVELOPER and FIXER
REPLENISHMENT TANKS with developer and
fixer solution. See the OPERATOR MANUAL.
Function Checkout
[1] Connect the PROCESSOR to the main power.
[2] Move the POWER SWITCH to the “ON” or “I”
position.
Warning
Be careful of the DRIVE SHAFT, GEARS and other
moving parts.
[3] Place MAGNETS on the PROCESSOR over the
COVER INTERLOCK SWITCHES so the DRIVE
MOTOR will operate without the PROCESSOR
COVER. Observe the inside edge of the
PROCESSOR COVER and determine the correct
position for the MAGNETS on the PROCESSOR.
[4] Allow the PROCESSOR to operate for 10 minutes. Check that the following systems operate correctly:
• The DRIVE SHAFT should operate continually for 5 minutes, then operate intermittently.
• The DRYER BLOWER should operate for 5 minutes.
• The WATER SOLENOID should operate and fill the WASH TANK.
• The “Low t“ INDICATOR should illuminate. This indicates the developer temperature is below the set•point.
• The RECIRCULATION PUMPS should operate for 5 minutes.
H164_0013AC
OPEN
CLOSED
H164_0067AC
H164_0067ACA
MAGNETS