Installation and Set Up 17
Aligning the Shrink Tunnel
When the film, product tray and product are correctly aligned, release the red lever
stopper and position the entire sealer and product tray assemblies in line with the shrink
tunnel opening centering the product down the center of the tunnel. Reset the red lever
stopper to lock the sealer assembly in position.
Red Lever
Stopper
Shrink
Tunnel
Opening
Sealer and
Product Tray
Assemblies
Summary of Contents for L-Bar Sealer Tunnel Combo Unit Value Series
Page 1: ...VS1620 L Bar Sealer Tunnel Combo Unit Value Series User Guide ...
Page 2: ......
Page 4: ......
Page 7: ......
Page 36: ...36 Parts List ElectricalSchematic Sheet1of2 ...
Page 37: ...Parts List 37 ElectricalSchematic Sheet2of2 ...
Page 38: ...38 Parts List VS1620 L Sealer Tunnel Combo Unit MainAssembly ...
Page 48: ...48 Parts List HeatTunnelOuterJacket VS1620DC ...
Page 50: ...50 Parts List L SealerAndFrame VS1620E ...
Page 54: ...54 Parts List L SealerTakeawayConveyor LTS504B P ...
Page 61: ......
Page 62: ......