24 Operation
Shutting Down
When shutting down it is important to let the temperature inside the shrink tunnel cool
down before turning off the main power.
Turn the Heater switch to the “OFF” position.
Attention!
Do not turn the conveyor and blower off until the shrink
tunnel has cooled down considerably.
After the temperature in the tunnel has cooled (this will be a considerable
amount of time) turn the Conveyor and Blower off.
Turn “Main Power” switch to the “OFF” position.
Summary of Contents for L-Bar Sealer Tunnel Combo Unit Value Series
Page 1: ...VS1620 L Bar Sealer Tunnel Combo Unit Value Series User Guide ...
Page 2: ......
Page 4: ......
Page 7: ......
Page 36: ...36 Parts List ElectricalSchematic Sheet1of2 ...
Page 37: ...Parts List 37 ElectricalSchematic Sheet2of2 ...
Page 38: ...38 Parts List VS1620 L Sealer Tunnel Combo Unit MainAssembly ...
Page 48: ...48 Parts List HeatTunnelOuterJacket VS1620DC ...
Page 50: ...50 Parts List L SealerAndFrame VS1620E ...
Page 54: ...54 Parts List L SealerTakeawayConveyor LTS504B P ...
Page 61: ......
Page 62: ......