12 Installation and Set Up
Installation and Set Up
Unpacking
Carefully unpack the Eastey L-Bar Sealer from the shipping carton.
Remove the shipping bolts and straps that secure the L-Bar Sealer and product tray to
the shipping pallet. Remove the product tray and lift the Case Taper off the pallet.
Attention!
The Eastey L-Bar Sealer is a very heavy piece of
equipment and will require a forklift or several people to
move safely off the shipping pallet.
For shipping the product tray has been disassembled from the L-Bar Sealer.
Assembly
The Eastey L-Bar Sealer has been assembled at the factory and requires very little
assembly.
Product Tray
The product tray contains both the film roller and the perforating pinwheel. The product
tray has been disassembled from the sealer for shipping. There are 4 bolts that are
used to mount the product tray. Use the provided hardware to attach the product tray to
the in feed end of the L-Bar sealer.
L-Bar Sealer
Section
Product
Tray
Summary of Contents for L-Bar Sealer Tunnel Combo Unit Value Series
Page 1: ...VS1620 L Bar Sealer Tunnel Combo Unit Value Series User Guide ...
Page 2: ......
Page 4: ......
Page 7: ......
Page 36: ...36 Parts List ElectricalSchematic Sheet1of2 ...
Page 37: ...Parts List 37 ElectricalSchematic Sheet2of2 ...
Page 38: ...38 Parts List VS1620 L Sealer Tunnel Combo Unit MainAssembly ...
Page 48: ...48 Parts List HeatTunnelOuterJacket VS1620DC ...
Page 50: ...50 Parts List L SealerAndFrame VS1620E ...
Page 54: ...54 Parts List L SealerTakeawayConveyor LTS504B P ...
Page 61: ......
Page 62: ......