![East EAHI-6000-SL-S Manual Download Page 25](http://html1.mh-extra.com/html/east/eahi-6000-sl-s/eahi-6000-sl-s_manual_4350354025.webp)
~ 23 ~
5.2.2.2 Drilling
Tools: electric drills (drill size: φ6mm), hammers and expansion pipes and bolts (M6*50mm)
Drill the holes at the marked location by the
φ6mm electric drill.
Install the expansion tube into the holes by the
hammer.
5.2.2.3 Installation of base support
Tools: screwdrivers and screws(M4*8mm)
Before installation, take down the upper
and lower dust covers of the battery to
avoid damaging the equipment during
installation.
During installation, recommend to inversely
place the battery on a soft surface to avoid
scratching. Align the fool-proofing interface on
the base with the battery (do not remove the
waterproof connector jacket installed on the
base), and fasten the base onto the battery.
Summary of Contents for EAHI-6000-SL-S
Page 66: ...64...