~ 22 ~
equipment, and fix the Y Axis of the level on
the left side of the equipment, and make the
line A vertical to the ground.
521mm from the ground. Locate the fixing
screw holes of the hanging support at 211mm
and 334mm above the line B from the line A.
Use the level to check whether two holes are
on the same horizontal line.
Measure and make the line C vertical to the
line A by the ruler and the level. The line C is
561mm from the ground. Locate the fixing
screw holes of the hanging support at 211mm
and 334mm above the line C. Use the level
to check whether two holes are on the same
horizontal line.
Add 220mm for each additional battery
Mark the foundation bolt hole D at 187.5mm
from the wall.
Mark the foundation bolt hole E at 630mm
from the foundation bolt hole D.