![Eagle EV-30 Owner'S Manual Download Page 25](http://html1.mh-extra.com/html/eagle/ev-30/ev-30_owners-manual_3294768025.webp)
rev_0.6
25 / 135
Connecting the Voltage Regulator
1. Connect the power cord of the machine to a free output of the regulator.
2. (For 6kW only) Connect the power cord of the fiber laser to a free output of the regulator.
3. Connect the power cord of the chiller to a free output of the regulator.
4. Connect the power cord of the exhaust(s) to a free output of the regulator.
5. Connect the input of the regulator to the output of the transformer.
Summary of Contents for EV-30
Page 41: ...rev_0 6 41 135 Machining Now you can start machining the parts...
Page 126: ...rev_0 6 126 135 3 Remove the access panel on top of the Z axis...
Page 127: ...rev_0 6 127 135 4 Remove the covers of the X axis drag chain...
Page 129: ...rev_0 6 129 135 7 Remove the corner access panel of the X Y intersection...
Page 133: ...rev_0 6 133 135 2 Remove the laser head from the Z axis slider...