- 9 -
2.3 Installation
Step 1
- Place the machine in the desired location using a tow motor or crane capable of handling a
load of 3,000lbs.
(See Fig. 2-3)
Fig. 2-3
Step 2
- Remove the lower rear inspection panel on the mast prior to raising the mast. The panel is
located on the end of the machine next to the turntable motor
.
The panel has a warning label affixed
to it.
(See Fig. 2-4a & Fig. 2-4b)
Fig. 2-4a
Fig. 2-4b
Step 3
- Lift the mast using hoisting tools. A tow motor or hoist rated for at least 3,000lbs is required.
While lifting the mast, use caution to ensure that wires and connectors are not pinched.
(See Fig. 2-5a)
Once the machine is fully upright, one individual can stabilize the mast while a second individual
fastens the four M10 bolts to secure the mast to the base. The M10 bolts are to be tightened to
30ft/lbs of torque.
(See Fig. 2-5b)
Fig. 2-5a
Fig. 2-5b
Summary of Contents for 2000F Series
Page 28: ...28 6 1 Illustration Base...
Page 29: ...29...
Page 32: ...32 6 3 Illustration Mast...
Page 34: ...34 6 4 Illustration Carriage...
Page 36: ...36 36 Swing Shaft short FG 142 1 37 Micro Switch MQS 216 1...
Page 39: ...39 6 7 Illustration Film Lift Cutting Assembly...
Page 41: ...41 6 7 Illustration Film Nipping Device Assembly...
Page 43: ...43 7 Electrical Schematics...
Page 44: ...44 7 Electrical Schematics...
Page 45: ...45 7 Electrical Schematics...
Page 46: ...46 7 Electrical Schematics...
Page 47: ...47 7 Electrical Schematics...
Page 48: ...48 7 Electrical Schematics...
Page 49: ...49 7 Electrical Schematics...