Installation, Operation and Parts Manual
EE-65A.40T
15
Step 4: Connect oil hoses as per Annex 2. Screw torque for oil hose connector is 60N*M.
Firstly, connect the oil hoses between the two platforms. There are 3 oil hoses together. And then, connect the 2 oil hoses from the main
platform with the tie-ins remained on the hydraulic block in the control cabinet.
Oil hoses go into the cabinet trough the holes remained at the bottom of the cabinet.
Attention: Connect as per the marks on the hoses and do not contaminate the hydraulic components during the connection.
Step 5: Connect the electrical system.
Refer to Annex 1 when fix the electrical system.
Connect the wire connectors for raising and lowering limit switches.
Connect the power supply cable to external electricity supply.
(For three phase power supply, if the lift doesn't raise and the motor may turn in the wrong direction, in such event, interchange wires U, V
in the control cabinet).
Step 6: Connect the pneumatic release system. Screw torque for air hose connector is 20N*M.
Connect air hoses as per the following fig.
External compressed shall be prepared by the end user before installation. Pneumatic pressure: 6 -8bar.