Installation, Operation and Parts Manual
EE-65A.40T
17
them lowered to the lowest position and then turn off the levelling valve. If the lift is equipped with a height limit switch, push DOWN II
button when platforms stop lowering at a safety height from the ground.
A.6.
After both levelling valves having been turned off, push the UP button to check if both platforms rise synchronously.
A.7.
Repeat doing step A5 and step A 6 until synchronization achieved.
Step 9: Fix base frames with expansion bolts.
1. Drill anchor holes for expansion bolts on the installation foundation with an electrical drill. Make sure to drill vertically.
2. Remove thoroughly the debris and dust in holes and ascertain that the posts stay right upon the circle previously marked by chalk.
3. Hammer in and secure expansion bolts.