background image

Water Sensing Cable

LP-LPD Water Leak Locating Panel Quick Start Guide

Page 3 of 10

LP-LPD Installation
Choosing Installation Location

The panel should not be installed in any improper environment, temperature limits or severe vibration.
LP-LPD can be installed in 35 mm DIN rail. Also, IP54 housing is available to the panel. The maximum
allowable sensing cable is 900m. If it is over 900m, please consult the manufacturer.

Important:

The LP-LPD panel is an electronic

device. Please take the caution below

Handle with care and avoid mechanical
shock and impact.

Keep dry.

Avoid electrostatic discharge to the panel

Prevent the contact with metal filings,
grease,

pipe

coatings

and

other

contaminants.

Installation Diagram

Installation of LP-LPD

• Install the 35mm Din rail in appropriated flat wall.
• Directly install the LP-LPD panel into the Din rail.

Connection between Power Cable and Communication Cable

All LP-LPDs are designed with an inbound cable (from the monitoring host system) and an outbound cable
(to the next LP-LPD). Connect the DC12V power supply (two DC terminals); the PE terminal is power
ground that can be connected to achieve favorable immunity from interference. The detailed wiring method
is shown in the figure below.

Po

w

er

+/-

Communic

ation cable

G

rou

nd

w

ire

Summary of Contents for LP-LPD

Page 1: ...ment LED will indicate the leak location and the relay output is energized The communication Protocol of LP LPD water leak locating panel is Modbus RTU which is easy to interface with BMS systems LP L...

Page 2: ...0 140 Operating temperature 0 45 32 117 Humidity 5 95 Non condensing Power Requirements LP LPD 12VDC 3W Serial Interface Network Configuration RS 485Serial port different baud rates are available and...

Page 3: ...hanical shock and impact Keep dry Avoid electrostatic discharge to the panel Prevent the contact with metal filings grease pipe coatings and other contaminants Installation Diagram Installation of LP...

Page 4: ...n digital signal for any BMS system Wiring Combination Alarm Status Output State N O COM No alarm Open Alarm Closed Loss of power Open N C COM No alarm Closed Alarm Open Loss of power Closed Connectio...

Page 5: ...tem LP LPD panel must be assigned address The factory default address of all LP LPDs is 0 and its baud rate is 9 600 Each LP LPD must be an unique address and same communication baud rate Please follo...

Page 6: ...as click Settings respectively When the baud rate and communication address are successfully set up it means the setup is finished It is worth noting that the settings will not change unless the LP L...

Page 7: ...leak sensing cable to the termination take measurement of the resistance between the yellow and black cables with the ohms range of multimeter after the connection between lead out wire and leak sens...

Page 8: ...box You can also enter the desired time into the clock display box and click Write into Module to correctly set the LP LPD time Maintenance Troubleshooting Each Panel is well tested before shipment St...

Page 9: ...n TX TRANSMIT RX RECEIVE State Flash Flash The LP LPD normally communicates with Master OFF Flash The LP LPD receives information from the Master and no message back OFF Normally ON The RS485 communic...

Page 10: ...ed properly If leak location is not accurate This may probably due to small amount of liquid still exists at different points on the sensing cable Also it can be due to some contamination with electro...

Reviews: