LP-LPD Water Leak Locating Panel Quick Start Guide

Page 7 of 10

Parameters Setup for Leak Sensing Cable

Since the electrical parameters of leak sensing cable be varied , the electrical parameters of various leak
sensing cables need to be set in the steps below:

Connect the leak sensing cable to the termination; take measurement of the resistance between the
yellow and black cables with the "ohms range" of multimeter after the connection between lead-out
wire and leak sensing cable.

Enter the length of connected sensing cable into "Length of Sensing Cable", and click "Write" to
set the length of connected sensing line in the LP-LPD module; enter the resistance of sensing
cable determined with a multimeter into "Black-line Resistance of Sensing Cable", and click
"Write".

Summary of Contents for LP-LPD

Page 1: ...ment LED will indicate the leak location and the relay output is energized The communication Protocol of LP LPD water leak locating panel is Modbus RTU which is easy to interface with BMS systems LP L...

Page 2: ...0 140 Operating temperature 0 45 32 117 Humidity 5 95 Non condensing Power Requirements LP LPD 12VDC 3W Serial Interface Network Configuration RS 485Serial port different baud rates are available and...

Page 3: ...hanical shock and impact Keep dry Avoid electrostatic discharge to the panel Prevent the contact with metal filings grease pipe coatings and other contaminants Installation Diagram Installation of LP...

Page 4: ...n digital signal for any BMS system Wiring Combination Alarm Status Output State N O COM No alarm Open Alarm Closed Loss of power Open N C COM No alarm Closed Alarm Open Loss of power Closed Connectio...

Page 5: ...tem LP LPD panel must be assigned address The factory default address of all LP LPDs is 0 and its baud rate is 9 600 Each LP LPD must be an unique address and same communication baud rate Please follo...

Page 6: ...as click Settings respectively When the baud rate and communication address are successfully set up it means the setup is finished It is worth noting that the settings will not change unless the LP L...

Page 7: ...leak sensing cable to the termination take measurement of the resistance between the yellow and black cables with the ohms range of multimeter after the connection between lead out wire and leak sens...

Page 8: ...box You can also enter the desired time into the clock display box and click Write into Module to correctly set the LP LPD time Maintenance Troubleshooting Each Panel is well tested before shipment St...

Page 9: ...n TX TRANSMIT RX RECEIVE State Flash Flash The LP LPD normally communicates with Master OFF Flash The LP LPD receives information from the Master and no message back OFF Normally ON The RS485 communic...

Page 10: ...ed properly If leak location is not accurate This may probably due to small amount of liquid still exists at different points on the sensing cable Also it can be due to some contamination with electro...

Reviews: