D 40.18 3
Before starting work
(in the morning or when starting paving)
- Heed the safety instructions.
- Check the personal protective equipment.
- Take an inspection walk around the paver finisher and check for leaks and damages.
- Install parts removed for transportation or for the night.
- When screed is operated with the optional gas heating system, open the closing
valves and the main shut-off valve.
- Perform the check according to the "Checklist for the vehicle operator" given below.
Check list for the machine operator
Check!
How?
Emergency stop button
- on the operating panel
- on both remote controls
Push in the button.
The diesel engine and all running drives
must stop immediately.
Steering
The paver finisher must immediately
follow every steering wheel movement
in a precise manner. Check straight
ahead travel.
Horn
- on the operating panel
- on both remote controls
Briefly press the horn button.
Horn signal must sound.
Lights
Switch on with the ignition key,
walk around the paver finisher
to check and switch off again.
Screed hazard flasher
(with vario screeds)
With the ignition switched on,
press the switches for extending/
retracting the screed parts.
The rear lights must flash.
Gas heater system (
o
):
- Bottle holder
- Bottle valve
- Pressure reducer
- Hose rupture protection
- Closing valve
- Main shut-off valve
- Connections
- Indicator lamps of the switch box
Check:
- Secure seat
- Cleanliness and tightness
- Working pressure 1.5 bar
- Function
- Function
- Function
- Tightness
- All indicator lamps must light up
when the system is switched on
Summary of Contents for F1800C
Page 1: ...OPERATION MAINTENANCE Paver Finisher F1800C Type 910 03 1019 4812076575...
Page 2: ...www dynapac com...
Page 24: ...A 2...
Page 32: ...B 8 4 Safety devices 5 7 11 3 1 2 9 12 10 10 8 4 5 6 7...
Page 43: ...B 19 71 70 40 41 42 xxxxxxxxxxxxxxxxx 7 7 51 53 73...
Page 58: ...B 34...
Page 84: ...C 10 18 26...
Page 88: ...D 10 18 4 13 14 17 16 18 15 10 12 11...
Page 90: ...D 10 18 6 13 14 17 16 18 15 10 12 11...
Page 92: ...D 10 18 8 13 14 17 16 18 15 10 12 11...
Page 94: ...D 10 18 10 21 20...
Page 96: ...D 10 18 12 23 22...
Page 98: ...D 10 18 14 25 24...
Page 100: ...D 10 18 16 26 27...
Page 102: ...D 10 18 18 28 29...
Page 104: ...D 10 18 20 30 31...
Page 106: ...D 10 18 22 32 33...
Page 108: ...D 10 18 24 34 35...
Page 110: ...D 10 18 26 36 37...
Page 112: ...D 10 18 28 38...
Page 114: ...D 10 18 30 39 40 41 42...
Page 116: ...D 10 18 32 44 43...
Page 118: ...D 10 18 34 45 46 47...
Page 120: ...D 10 18 36 47...
Page 124: ...D 10 18 40 90 91 92 94 93 95 96 96...
Page 126: ...D 10 18 42...
Page 127: ...D 24 18 1 D 24 18 Operating the display...
Page 151: ...D 24 18 25 Example...
Page 154: ...D 24 18 28...
Page 159: ...D 30 18 5 Control platform telescoping seat consoles 10 B A B 11 6 4 5 2 8 A 9 7 12...
Page 192: ...D 30 18 38...
Page 197: ...D 40 18 5 1 9 2 5 5 3 4 6 7 8...
Page 199: ...D 40 18 7 1 9 2 5 5 3 4 6 7 8...
Page 202: ...D 40 18 10 1 2 3 4 5 6...
Page 204: ...D 40 18 12 2 3 6 5 7 1...
Page 206: ...D 40 18 14 2 2 3 1 6 5 4...
Page 210: ...D 40 18 18 A 1 3 2 4...
Page 212: ...D 40 18 20 1 2 5 6 7 4 11 10 3 12 9 8...
Page 215: ...D 40 18 23 3 1 2...
Page 217: ...D 40 18 25 1 2 3...
Page 219: ...D 40 18 27 1 3 14 2 15 5 8 4 9 7 6 5 4 11 10 12 13 16...
Page 226: ...D 40 18 34...
Page 243: ...F 31 18 1 F 31 18 Maintenance conveyor 1 Maintenance conveyor...
Page 250: ...F 31 18 8...
Page 251: ...F 40 18 1 F 40 18Maintenance auger assembly 1 Maintenance auger assembly...
Page 275: ...F 60 18 1 F 60 18 Maintenance hydraulic system 1 Maintenance hydraulic system...
Page 291: ...F 70 18 1 F 70 18 Maintenance drive units 1 Maintenance drive units...
Page 303: ...F 82 18 1 F 82 18 Maintenance electrical system 1 Maintenance electrical system...
Page 318: ...F 82 18 16...
Page 326: ...F 90 18 8...
Page 327: ...F 100 1 F 100 Tests stopping 1 Tests checks cleaning stopping...
Page 338: ...F 100 12...
Page 340: ...F 110 18 2 2 6 6 1 7 3 4 5...
Page 346: ...F 110 18 8...
Page 347: ......
Page 348: ...www dynapac com...