D 40.12 3
Before starting work
(in the morning or when starting paving)
- Heed the safety instructions.
- Check the personal protective equipment.
- Take an inspection walk around the paver finisher and check for leaks and damages.
- Install parts removed for transportation or for the night.
- When screed is operated with the optional gas heating system, open the closing
valves and the main shut-off valve.
- Perform the check according to the "Checklist for the vehicle operator" given below.
Check list for the vehicle operator
Check!
How?
Emergency stop button
- on the operating panel
- on both remote controls
Push in the button.
The diesel engine and all running drives
must stop immediately.
Steering
The paver finisher must immediately fol-
low every steering wheel movement in
a precise manner. Check straight
ahead travel.
Horn
- On the operating panel
- on both remote controls
Briefly press the horn button.
Horn signal must sound.
Lights
Switch on with the ignition key, walk
around the paver finisher to check and
switch off again.
Screed warning light
With the ignition switched on, press
the switches for extending/retracting
the screed parts.
The warning lamps must flash.
Gas heater system (
o
):
- Bottle holders
- Bottle valves
- Pressure reducer
- Hose break safety devices
- Shut-off valves
- Main shut-off valve
- Connections
- Indicator lamps of the switch box
Check:
- Secure seat
- Cleanliness and tightness
- Working pressure 1.5 bar
- Function
- Function
- Function
- Tightness
- All indicator lamps must light up when
the system is switched on
Summary of Contents for F1250CS
Page 1: ...OPERATION MAINTENANCE Paver Finisher F1250CS Type 458 01 1019 4812076240 ...
Page 2: ...www dynapac com ...
Page 24: ...A 2 ...
Page 31: ...B 7 4 Safety devices 4 5 6 8 2 3 11 9 2 10 1 7 ...
Page 34: ...B 10 5 2 Permissible approach angle max 14 max 12 8 ...
Page 40: ...B 16 8 6 3 5 7 41 14 10 20 15 19 3 6 8 14 18 17 16 21 13 11 5 4 14 12 1 40 2 42 o 10 9 9 ...
Page 41: ...B 17 xxxxxxxxxxxxxxxxx 32 30 31 ...
Page 46: ...B 22 6 3 CE marking No Pictogram Meaning 30 CE sound output level ...
Page 80: ...C 10 12 28 ...
Page 84: ...D 10 12 4 15 16 18 13 19 12 17 14 11 10 10 ...
Page 86: ...D 10 12 6 15 16 18 13 19 12 17 11 10 10 14 ...
Page 88: ...D 10 12 8 15 16 18 13 19 12 17 11 10 10 14 ...
Page 90: ...D 10 12 10 22 21 20 ...
Page 92: ...D 10 12 12 25 24 ...
Page 94: ...D 10 12 14 27 26 ...
Page 96: ...D 10 12 16 29 28 ...
Page 98: ...D 10 12 18 31 ...
Page 100: ...D 10 12 20 32 33 ...
Page 102: ...D 10 12 22 34 ...
Page 104: ...D 10 12 24 36 ...
Page 106: ...D 10 12 26 34 34a ...
Page 108: ...D 10 12 28 35 35a ...
Page 110: ...D 10 12 30 36 38 37 ...
Page 112: ...D 10 12 32 39 ...
Page 114: ...D 10 12 34 41 40 43 42 ...
Page 116: ...D 10 12 36 44 ...
Page 118: ...D 10 12 38 45 ...
Page 120: ...D 10 12 40 46 ...
Page 122: ...D 10 12 42 Electric heating element o 50 51 52 53 ...
Page 124: ...D 10 12 44 Gas heating element o 62 60 61 63 ...
Page 128: ...D 10 12 48 90 91 92 93 94 ...
Page 130: ...D 10 12 50 90 91 92 93 94 ...
Page 136: ...D 10 12 56 4 3 Establish radio link 100 110 41 14 ...
Page 140: ...D 10 12 60 4 5 Control elements of radio remote control 101 100 ...
Page 142: ...D 10 12 62 102 103 ...
Page 144: ...D 10 12 64 106 104 105 109 110 111 107 108 ...
Page 146: ...D 10 12 66 106 104 105 109 110 111 107 108 ...
Page 148: ...D 10 12 68 112 113 114 115 116 ...
Page 150: ...D 10 12 70 112 113 114 115 116 ...
Page 152: ...D 10 12 72 112 113 114 115 116 ...
Page 154: ...D 10 12 74 112 113 114 115 116 ...
Page 156: ...D 10 12 76 121 122 123 124 117 118 119 120 ...
Page 158: ...D 10 12 78 121 122 123 124 117 118 119 120 ...
Page 160: ...D 10 12 80 121 122 123 124 117 118 119 120 ...
Page 163: ...D 24 12 1 D 24 12 Operating the display ...
Page 188: ...D 24 12 26 Example ...
Page 210: ...D 30 12 20 ...
Page 215: ...D 40 12 5 1 5 2 5 5 4 6 3 9 7 8 ...
Page 217: ...D 40 12 7 1 5 2 5 5 4 6 3 9 7 8 ...
Page 220: ...D 40 12 10 5 4 5 5 1 2 3 ...
Page 222: ...D 40 12 12 6 2 1 3 4 4 4 5 5 5 7 ...
Page 224: ...D 40 12 14 4 6 2 6 6 1 3 5 ...
Page 228: ...D 40 12 18 2 2 1 2 3 4 ...
Page 230: ...D 40 12 20 1 3 8 8 2 13 4 5 6 7 8 9 12 11 10 ...
Page 233: ...D 40 12 23 1 2 3 4 5 ...
Page 235: ...D 40 12 25 1 2 4 4 16 3 9 7 6 4 5 8 11 11 10 12 13 14 11 10 10 17 15 ...
Page 252: ...E 10 12 10 ...
Page 257: ...F 3 12 1 F 3 12 Maintenance conveyor 1 Maintenance conveyor ...
Page 264: ...F 3 12 8 ...
Page 265: ...F 4 12 1 F 4 12 Maintenance auger assembly 1 Maintenance auger assembly ...
Page 288: ...F 5 12 16 ...
Page 289: ...F 6 12 1 F 6 12 Maintenance hydraulic system 1 Maintenance hydraulic system ...
Page 303: ...F 7 12 1 F 7 12 Maintenance drive unit 1 Maintenance drive unit ...
Page 313: ...F 8 12 1 F 8 12 Maintenance electrical system 1 Maintenance electrical system ...
Page 328: ...F 11 12 2 7 1 5 6 6 4 2 8 3 ...
Page 334: ...F 11 12 8 ...
Page 335: ...F 100 1 F 100 Checking shutdown 1 Tests checks cleaning shutdown and disposal ...
Page 347: ......
Page 348: ...www dynapac com ...