- 11 -
Install the lower sections to the insulated channel using the 2
-
3/8" x 2" U-Bolts, 2 saddle clamps, 4
flat washers, 4 split washers, and 4 nuts as shown in
Figure 7
. The base section tube should extend
1-1/4" beyond the bottom of the U-bolt clamp. When tightening, observe the split washers. When
they fully seat (flatten out), the clamp is tight enough. Any clamp should be tightened evenly from
side-to-side with an equal amount of thread above each nut.
Figure - 7