Multi-Story: 

 

Consult local building or other 

applicable codes for requirements in your 
area.  In the U.S., NFPA 211 10.6.3 (2013) 
states:  “Vents that pass through the floors 
of buildings requiring the protection of 
vertical openings shall be enclosed within an 
approved enclosure.  The enclosure walls shall 
have a fire resistance rating of not less than 
1 hour where a vent is located in a building 
less than four stories in height.  The enclosure 
walls shall have a fire resistance rating of not 
less than 2 hours where a vent is located in a 
building four or more stories in height."

FIRESTOPS  (

Fig. 8

)

1.  Firestops are required at each ceiling/

floor penetration including an attic.  
Firestops are not required at the roof 
deck penetration.

2.  Cut and/or frame hole. 

(Table  3

)

3.  Slide the two halves together and attach 

to the ceiling.

Figure 9

ALIGN TABS WITH

MOUNTS

GASKET

EXTERIOR 

WALL PLATE

INTERIOR 

WALL PLATE

Figure 10

REMOVE GASKET

INSERT BIRD GUARD

TERMINATIONS:

Horizontal Single Pipe  (Fig.9)

1.  Locate penetration in wall.
2.  Cut or cut and frame hole. 

(Table  3

)

3.  Attach Inner Plate to wall.
4.  Attach / seal Outer Plate to outside wall.
5.  Line up keyway, slide black pipe (UV 

Protected) or termination through 
plates.

6.  If termination is used, attach with screws.  

Align tabs with pipe mounts.

7.  Add additional components to raise vent 

level if desired (vent to be 12" above 
grade or average snow level).

8.  Remove gasket and install Bird Guard 

into end of pipe. 

(Fig.10)

9.  Install Poly Pro venting system to/from 

termination to appliance.

Figure 8

FIRESTOP

FIRESTOP

ENCLOSURE

FIRESTOP

Summary of Contents for polypro

Page 1: ...PolyPro Installation Instructions PolyPro Single Wall Gas Vent System for Category II IV Gas Burning Appliances...

Page 2: ...egrity of ALL joints upon completion of assembly This venting system must be free to expand and contract under normal operation Assure unrestricted vent movement where required through walls ceilings...

Page 3: ...ATION 4 PERMITS 4 GENERAL INSTALLATION NOTES 4 CLEARANCES TABLE 1 4 CONDENSATE DRAIN 5 EQUIVALENT LENGTH CHART TABLE 2 5 JOINT CONNECTIONS 6 APPLIANCE CONNECTION 6 INSTALLATION 7 ENCLOSURE REQUIREMENT...

Page 4: ...must not be routed into through or within any other vent such as an existing masonry or factory built chimney flue unless that vent or chimney is not being used to vent another appliance and is only u...

Page 5: ...ecified by the appliance manufacturer If specific guidance is not offered by the appliance manufacturer as to Equivalent Vent Lengths EVL for vent components the general guidelines in Table 2 can be u...

Page 6: ...ing Band on male pipe section Fig 2 Insert locking tab into locking band recess rotate button away from Locking Band Clasp insert pipe sections push lock band clamp downward into socket disengage sock...

Page 7: ...rted by the appliance On Duravent and other certain clamp styles or greater All thread may be used as an extension 6 Vertical installations must be supported every 10 feet 3 meters or less Fig 7 7 Elb...

Page 8: ...stops are not required at the roof deck penetration 2 Cut and or frame hole Table 3 3 Slide the two halves together and attach to the ceiling Figure 9 ALIGN TABS WITH MOUNTS GASKET EXTERIOR WALL PLATE...

Page 9: ...N A N A N A TWIN PIPE HORIZONTAL CLASS IIB 7 3 8 x 25 8 187mm x 65mm 8 3 8 x 37 8 212 x 85mm 9 x 43 8 228 x 100mm N A N A N A TWIN PIPE HORIZONTAL CLASS IIC Framing Dimensions 8 x 3 200 x 77mm 8 7 8...

Page 10: ...outside wall 4 Slide cap through exterior wall plate into hole from outside building Cap must not be installed sloped downward 5 Orient termination so air intake slots face down 6 Seal termination to...

Page 11: ...Figure 16 CENTERLINE OF EXHAUST OUTLET OF APPLIANCE Vertical Concentric Fig 17 1 Locate penetration Fig 16 2 Cut hole in roof Table 3 3 Cut hole in ceiling above appliance Cut hole s big enough for p...

Page 12: ...The upper support plate with a flange for B vent and factory built chimney Fig 21 must be affixed to the top of the conduit via screws Anchor bolts must be used when attaching a flat support plate to...

Page 13: ...are exposed to the elements for wear or damage If damage is found the components should be replaced immediately Where possible look into the Termination Cap to verify no foreign material is there to...

Page 14: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Page 15: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Page 16: ...ty This warranty provides no cash surrender value The terms and conditions of this warranty may not be modified altered or waived by any action inaction or representation whether oral or in writing ex...

Reviews: