12

8.  Install gaskets into Co-Linear Adapter (if 

applicable). 

(Fig.12)

9.  Connect Co-Linear Adapter to 

termination (if applicable). 

(Fig.18)

10.  Install Poly Pro venting system to/from 

Co-Linear Adapter or termination to 
appliance.

 

BLACK

UV PROTECTED PIPE

RUBBER FLASHING

Figure 19- Vertical Pipe Termination

RIGID BLACK 

UV PROTECTED 

POLYPRO

GASKET 

PLATE 

STAINLESS 

RELINE 

HANGER 

BRACKET

RIGID 

POLYPRO

STAINLESS

UPPER 

SUPPORT 

PLATE

GASKET PLATE 

/ HANGER 

MOUNT 

HARDWARE

FLANGE

BIRD GUARD

Figure 20

CLEARANCE 

HOLE 

1.75" MAT'L 

SPACE MIN

Upper supports may be field supplied and 
listed, the listing requires: Min thickness of 24 
ga (0.020") SS, no larger than 18" Dia or 18" 
max length rectangle, 4 vent runs max per 
support.  The listing requires clearance holes 
no larger than 5 1/8" Dia, with spacing 1 3/4" 
apart.

The upper support plate (with a flange for 
B vent and factory built chimney, 

Fig.21

must be affixed to the top of the conduit via 
screws.  Anchor bolts must be used when 
attaching a flat support plate to the top of 
Masonry or other chase (not shown).  Support 
plate must be weather tight.  The SS Hanger 
Bracket is installed under the Gasket Plate 
and affixed to the top of the support plate 
with screws (

Fig.21)

.  Use non-hardening 

sealant as required.

Vertical single pipe (Fig.19)

1.  Follow instructions for Vertical 

Concentric Termination.

2.  Attach flashing to roof. 

(Fig.19)

• 

Rubber boot flashing or similar, 
ensure  an effective, leak-proof seal 
is maintained.

• 

Use BLACK UV protected pipe.

3.  Maintain 12 in. (305mm) min. clearance 

above highest anticipated snow level, 
max 24 in. (610mm) above roof.

MULTIPLE VENTS IN ONE CONDUIT 

(Fig.20)
Multiple PolyPro vent systems may be 
installed within one conduit.  Listed 2"-4" 
M&G components must be used, and the 
conduit (if pre-existing) must be inspected 
and deemed sound.

Summary of Contents for polypro

Page 1: ...PolyPro Installation Instructions PolyPro Single Wall Gas Vent System for Category II IV Gas Burning Appliances...

Page 2: ...egrity of ALL joints upon completion of assembly This venting system must be free to expand and contract under normal operation Assure unrestricted vent movement where required through walls ceilings...

Page 3: ...ATION 4 PERMITS 4 GENERAL INSTALLATION NOTES 4 CLEARANCES TABLE 1 4 CONDENSATE DRAIN 5 EQUIVALENT LENGTH CHART TABLE 2 5 JOINT CONNECTIONS 6 APPLIANCE CONNECTION 6 INSTALLATION 7 ENCLOSURE REQUIREMENT...

Page 4: ...must not be routed into through or within any other vent such as an existing masonry or factory built chimney flue unless that vent or chimney is not being used to vent another appliance and is only u...

Page 5: ...ecified by the appliance manufacturer If specific guidance is not offered by the appliance manufacturer as to Equivalent Vent Lengths EVL for vent components the general guidelines in Table 2 can be u...

Page 6: ...ing Band on male pipe section Fig 2 Insert locking tab into locking band recess rotate button away from Locking Band Clasp insert pipe sections push lock band clamp downward into socket disengage sock...

Page 7: ...rted by the appliance On Duravent and other certain clamp styles or greater All thread may be used as an extension 6 Vertical installations must be supported every 10 feet 3 meters or less Fig 7 7 Elb...

Page 8: ...stops are not required at the roof deck penetration 2 Cut and or frame hole Table 3 3 Slide the two halves together and attach to the ceiling Figure 9 ALIGN TABS WITH MOUNTS GASKET EXTERIOR WALL PLATE...

Page 9: ...N A N A N A TWIN PIPE HORIZONTAL CLASS IIB 7 3 8 x 25 8 187mm x 65mm 8 3 8 x 37 8 212 x 85mm 9 x 43 8 228 x 100mm N A N A N A TWIN PIPE HORIZONTAL CLASS IIC Framing Dimensions 8 x 3 200 x 77mm 8 7 8...

Page 10: ...outside wall 4 Slide cap through exterior wall plate into hole from outside building Cap must not be installed sloped downward 5 Orient termination so air intake slots face down 6 Seal termination to...

Page 11: ...Figure 16 CENTERLINE OF EXHAUST OUTLET OF APPLIANCE Vertical Concentric Fig 17 1 Locate penetration Fig 16 2 Cut hole in roof Table 3 3 Cut hole in ceiling above appliance Cut hole s big enough for p...

Page 12: ...The upper support plate with a flange for B vent and factory built chimney Fig 21 must be affixed to the top of the conduit via screws Anchor bolts must be used when attaching a flat support plate to...

Page 13: ...are exposed to the elements for wear or damage If damage is found the components should be replaced immediately Where possible look into the Termination Cap to verify no foreign material is there to...

Page 14: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Page 15: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Page 16: ...ty This warranty provides no cash surrender value The terms and conditions of this warranty may not be modified altered or waived by any action inaction or representation whether oral or in writing ex...

Reviews: