![DURAG D-R 290 Operating Manual Download Page 82](http://html.mh-extra.com/html/durag/d-r-290/d-r-290_operating-manual_2541137082.webp)
5 | Installation
82
D-R 290
Opening the housing
1.
Open the four quick-release clamps and swing down the measuring unit.
2.
The 6 screws for the housing cover are accessible internally. Undo them in the se
quence specified at the bottom left.
Before undoing the last screw (6) grasp the handle of the housing cover with one
hand, so that the housing cover is supported by the lower arm.
3.
Put the housing cover aside.
Setting the relay outputs with switches SW1 and SW2
The switches SW1 and SW2 are located on the main circuit board (see
).
Fig. 5.16: Position of the switches SW1 and 2 in the measuring head
(top right) shows the available switch settings and their functions. Switch
SW1 (designation on the printed circuit board) configures relay 1. Switch SW2 relates
to relay 2.
Open the housing:
First pull the plug
then open the door
Fig. 5.14: Attachment screws
for the
housing cover
Fig. 5.15: Undo
Summary of Contents for D-R 290
Page 12: ...12 D R 290 ...
Page 18: ...1 General 18 D R 290 ...
Page 20: ...20 D R 290 ...
Page 28: ...2 Safety 28 D R 290 ...
Page 30: ...30 D R 290 ...
Page 38: ...3 Delivery 38 D R 290 ...
Page 40: ...40 D R 290 ...
Page 60: ...4 Product description 60 D R 290 ...
Page 106: ...106 D R 290 ...
Page 152: ...152 D R 290 ...
Page 174: ...8 Maintenance 174 D R 290 ...
Page 176: ...176 D R 290 ...
Page 178: ...9 Appendix 178 D R 290 Fig 9 2 Measurement point questionnaire 2 ...
Page 194: ...9 Appendix 194 D R 290 ...
Page 200: ...11 Index 200 D R 290 ...
Page 202: ...GmbH Kollaustraße 105 22453 Hamburg Germany www durag com ...