9
From the open end of the trunk cable reel, replace the cable end with an end cap at the bus connector.
1
Use the bus connector unlock tool to unlock the port upper cover.
2
Loosen the three screws with the
screwdriver. Untighten the cap as
circled below, and remove the extra
cable.
3
Screw the cap back to the port, and plug in the AC bus end cap.
4
Plug the upper cover back to the bus connector.
5.6 Installation: AC trunk cable
1
Route the trunk cable such that the bus connectors align with the centers of the PV module (single) and/or PV module
cluster (dual / quad).
IMPORTANT! Insert the AC Sub Cap (section 5.1 - item F) over any unused bus connectors.
2
Repeat the steps in section 5.5 above to separate the trunk cable reel from the first unused bus connector in the PV
array branch.
IMPORTANT! Do not exceed the combined AC output current rating of 24 Amps per branch. Refer to the table in
Appendix D for a branch limit calculator using different microinverter combinations.
5.5 Pre-Installation: AC trunk cable end cap installation
Installation Manual
Summary of Contents for D1500-M4
Page 8: ...5 5 Installation Planning Installation Manual...
Page 24: ...21 Appendix A Installation Map Template Installation Manual...
Page 25: ...22 Appendix B 120 240 Split phase Electrical Single Line Diagram Installation Manual...
Page 26: ...23 Appendix C 120 208 Three phase Electrical Single Diagram Installation Manual...
Page 28: ...Doc 97010 Installation Manual...