12
5.10 Installation: PV input port connections
1
Turn on the AC breaker of the branch circuit.
2
Turn on the main AC breaker of the house. Your system will start to generate power after the regulated grid timing
sequence has completed.
6.1 Setting up the monitoring system
Refer to the DTU User Manual or DTU Quick Install Guide, and Quick Installation Guide for Online Registration to install the
DTU and set up the monitoring system. Product information is subject to change without notice.
Download reference manuals at www.duracellpowercenter.com
1.
Connect the DC cables from the PV module(s)to the PV input port(s) of the microinverter.
D350-M1
D700-M2
D1500-M4
6 Energizing the system
Installation Manual
Summary of Contents for D1500-M4
Page 8: ...5 5 Installation Planning Installation Manual...
Page 24: ...21 Appendix A Installation Map Template Installation Manual...
Page 25: ...22 Appendix B 120 240 Split phase Electrical Single Line Diagram Installation Manual...
Page 26: ...23 Appendix C 120 208 Three phase Electrical Single Diagram Installation Manual...
Page 28: ...Doc 97010 Installation Manual...