The D350-M1 / D700-M2 / D1500-M4 microinverter is a grid support utility interactive
inverter. The microinverters comply with California Rule 21. The grid support functions are
controlled via the Power Monitoring Platform. The PC-PRO is required in this PV
system.
Only an authorized installer is allowed to make grid profile changes by following the
requirements of the local electrical utility.
Simultaneous use of Fixed Power Factor and Volt/Var is not supported.
SA9: Low/High Voltage Ride Through (L/H VRT) and Must Trip Settings
Region
Voltage at PCC (%
Nominal Voltage)
Ride-Through Until
Operating Mode
Maximum Trip
Time (s)
Range of Adjustable
Maximum Trip
Time (s)
High Voltage 2
(HV2)
N/A
N/A
0.16 sec.
0.16 sec.
High Voltage 1
(HV1)
110 < V < 120
12 sec.
Momentary
Cessation
13 sec.
1-13 sec.
Near Nominal
(NN)
Indefinite
Continuous
Operation
N/A
N/A
Low Voltage 1
(LV1)
20 sec.
Mandatory
Operation
21 sec.
21 sec.
Low Voltage 2
(LV2)
10 sec.
Mandatory
Operation
11 sec.
11-21 sec.
Low Voltage 3
(LV3)
V < 50
1 sec.
Momentary
Cessation
1.5 sec.
1.5-2 sec.
SA10: Low/High Frequency Ride Through (L/H FRT) and Must Trip Settings
Manufacturer stated accuracy
Measurement
Accuracy
Volts
+/- 1%
Watts
+/- 5%
VAr
+/- 6%
Power factor
+/- 0.05
Hz
+/- 0.1
Region
System
Frequency
Default
Settings
Ride-Through Until
(s)
Ride-Through
Operational Mode
Trip Time Default (s)
Range of Adjustable
Trip Time Default(s)
High Frequency
2 (HF2)
f > 62
No Ride-Through
N/A
0.16 sec.
0.16 sec.
High Frequency
1 (HF1)
60.5 < f < 62
299 sec.
Mandatory
Operation
300 sec.
0.1-300 sec.
Near Nominal
(NN)
58.5 < f <60.5
Indefinite
Continuous
Operation
N/A
N/A
Low Frequency 1
(LF1)
57.0 < f <58.5
299 sec.
Mandatory
Operation
300 sec.
0.1-300 sec.
Low Frequency 2
(LF2)
f < 57.0
No Ride-Through
Not Applicable
0.16 sec.
0.16 sec.
11 Grid Support Details
Installation Manual
Summary of Contents for D1500-M4
Page 8: ...5 5 Installation Planning Installation Manual...
Page 24: ...21 Appendix A Installation Map Template Installation Manual...
Page 25: ...22 Appendix B 120 240 Split phase Electrical Single Line Diagram Installation Manual...
Page 26: ...23 Appendix C 120 208 Three phase Electrical Single Diagram Installation Manual...
Page 28: ...Doc 97010 Installation Manual...