Technical Information
LVB
Page 6 of 12
Initial operation
Initial operation
Initial operation
Initial operation
Please notice the mounting instructions for light grids! (Page 9)
1. Remove the top of the housing and fasten the base.
Use only the specified holes for mounting the housing!
See housing diagram on page 12.
2. Plug in the connectors of transmitter and receiver, screw in the fittings loosely.
3. Set DIP 3 to „on“ for self calibration. (See page 4)
4. Connect the relay contacts.
5. Connect the power supply.
Set DIP-3 to „off“ to complete self calibration.
6. Verify that the light grid is working correct in the entire monitoring area.
7. Screw the top on the housing in its place again.
8. Screw in the fittings tight.
Version LVB