![Dunkirk PVWB Installation Instructions Manual Download Page 23](http://html1.mh-extra.com/html/dunkirk/pvwb/pvwb_installation-instructions-manual_2539845023.webp)
23
BOILER CONTROLS AND PIPING
Repair Parts
Key
No.
Description
Part
No.
1
¾” ASME Relief Valve
146-22-011
2
¾” x 7½” Nipple
146-07-041
3
Temperature Pessure Gauge - 5" Stem
146-23-009
6
1¼” x ¾” x 1 ¼” Tee
151-00-01
7
Aquastat Relay
101-00-02
8
Isolation Ball Valve
146-26-043
‡
Grundfos UP15-42F Circulator
CI-006.01
9
Taco 007 Circulator
CI-001.03
10
1¼” x 2½” Nipple
146-07-044
11
1¼” Bent Return Nipple
146-07-003
12
Intermittent Pilot Control
146-62-070
‡
Spill Switch (36TX16-6281) 340° F
146-60-002
‡
Rollout Switch
146-29-002
‡
4" Vent Damper (w 3" Adapter)
118-20-04
‡
5" Vent Damper
118-20-05
‡
6" Vent Damper
118-20-06
‡
7" Vent Damper
118-20-07
‡
Vent Damper Operator (Motor)
114-00-02
‡
400° F Black Silicone Rubber Adhesive
Sealant (10.3 oz. Cartridge)
‡ Not illustrated
146-06-020
Note:
the circulator and ball valves do not come
pre-installed.”
Summary of Contents for PVWB
Page 24: ...14683002 Rev 3 November 2004...