21
Installation and Operation of Flexible Batch Broiler
C-3. Weekly Cleaning
With outer front panel
removed, lift up the
combustion chamber panel.
Swing the right side of
the panel out as shown.
Clean and set aside.
2
1
Remove discharge panel and scraper
as was performed for daily cleaning.
Remove burner shield.
1
2
Lift rear of burner out of
saddle and continue to
hold it.
Orifice
Hood
Lift flame arrestor
up to disengage tabs
from slots. Tabs are
located under the
front of the arrestor.
Pull flame arrestor out.
Clean and reinstall.
TAB ON THE BOTTOM OF THE FLAME
ARRESTOR DROPS INTO SLOT
Pull burner off of orifice and through broiler
wall. Remove from chamber. Clean, empty any
remaining water from the burner and replace.
Thoroughly dry out all burner ports!
Summary of Contents for FBB-NC-120
Page 32: ...Installation and Operation of Flexible Batch Broiler 32 VI WIRING SCHEMATIC...
Page 33: ...33 Installation and Operation of Flexible Batch Broiler NOTES...
Page 34: ...Installation and Operation of Flexible Batch Broiler 34 NOTES...
Page 35: ...35 Installation and Operation of Flexible Batch Broiler NOTES...