![Duke FBB-NC-120 Installation And Operation Manual Download Page 18](http://html1.mh-extra.com/html/duke/fbb-nc-120/fbb-nc-120_installation-and-operation-manual_2539147018.webp)
Installation and Operation of Flexible Batch Broiler
18
C-1. Four (4) Hour Cleaning
All components that are in contact with food product must be cleaned and sanitized every 4 hours.
Loader and Carriage: Remove loader from
carriage and sanitize food contact areas.
Caution: Hot surface near door!
Wear insulated gloves.
Discharge Chute: With discharge
hood removed, sanitize outside
chute surface.
Caution: Hot surface near door!
Wear insulated gloves.
Summary of Contents for FBB-NC-120
Page 32: ...Installation and Operation of Flexible Batch Broiler 32 VI WIRING SCHEMATIC...
Page 33: ...33 Installation and Operation of Flexible Batch Broiler NOTES...
Page 34: ...Installation and Operation of Flexible Batch Broiler 34 NOTES...
Page 35: ...35 Installation and Operation of Flexible Batch Broiler NOTES...