![DuctlessAire DA-09 Service Manual Download Page 28](http://html.mh-extra.com/html/ductlessaire/da-09/da-09_service-manual_2537953028.webp)
Service Manual
28
.
3.5
Adding Refrigerant Charge
If the unit interconnect length exceeds the standard charge length of the system, additional
refrigerant must be added to the system.
DuctlessAire
systems are charged for a 25ft line
set as standard.
The additional refrigerant MUST BE WEIGHED INTO THE SYSTEM, as these are
critically charged systems.
The additional amount of refrigerant required is calculated from the extra length of
interconnect multiplied by the refrigerant quantity in oz/ft.
All systems use R410A:
9000/12000btu
Models
Add 0.3 oz/ft of R410A over 25ft
18000/24000btu Models
Add 0.5 oz/ft of R410A over 25ft
Added Charge required for a line set of:
Unit
30ft
35ft
40ft
45ft
50ft
9000/12000btu
1.5oz
3.0oz
4.5oz
6.0oz
7.5oz
18000/24000btu
2.5oz
5.0oz
7.5oz
10.0oz
12.5oz
Remember the Schrader connection for these R410A units is a 5/16” size, not the standard
¼”, this distinguishes the system from an R22 system, so that the incorrect gauges or
refrigerant cannot be used by mistake.
3.6
Condensate Piping
Follow installation instructions and remember water runs down hill. Installation diagram is
in the Installation and Operation Manual.
To check the condensate piping system, all condensate should be completely drained from
Summary of Contents for DA-09
Page 1: ...Service Manual 1 Service Manual Mini Splits ...
Page 12: ...Service Manual 12 ...
Page 13: ...Service Manual 13 ...
Page 14: ...Service Manual 14 ...