Operation (CME)
5-10
•
Once the desired amount of “HTF” has been attained and
the glycol level gauge is showing ½ full, turn the supply
ball valve
figure 35
(21-1) to the “Closed” position and
continue with the following procedures.
•
Turn the fill/drain ball valve
figure 36
(22-2) to the
“Closed” position.
•
Toggle the pump switch
figure 37
(23-1) to the “Off”
(down) position.
•
Turn the supply ball valve
figure 35
(21-2) back to the
“Open” position.
Figure 37-600 GTS Control Panel Pump Switch
Figure 38-Glycol Level
Gauge