Tundra II Furnace Installation and Operation Manual
18
N.B.: The furnace air jacket is not totally air tight. It is normal to detect some air
leaks at the jacket’s joints.
Components provided with the furnace:
10 hot air start-off
adapter
(A)
4 lids
(B)
Type A #10 black
screws
(C)
#8 selt-taping black
screws
(D)
5.1 Hot air distribution plenum height according to ceiling height
Remember to take into account the 5" (127 mm) clearance to combustibles above the
plenum.
5.1.1 Plenum’s minimum height; (only plenum (B) must be used)
For a minimum ceiling height of 69" (175 cm).
Summary of Contents for DF02001
Page 30: ...Tundra II Furnace Installation and Operation Manual 30 ...
Page 63: ...Tundra II Furnace Installation and Operation Manual 63 11 Exploded diagram and parts list ...
Page 64: ...Tundra II Furnace Installation and Operation Manual 64 ...
Page 65: ...Tundra II Furnace Installation and Operation Manual 65 ...
Page 66: ...Tundra II Furnace Installation and Operation Manual 66 ...
Page 67: ...Tundra II Furnace Installation and Operation Manual 67 ...
Page 73: ...Tundra II Furnace Installation and Operation Manual 73 12 2 1 Technical data Tundra II ...
Page 74: ...Tundra II Furnace Installation and Operation Manual 74 ...