Tundra II Furnace Installation and Operation Manual
31
7.2 Installation and connection of the “RTD” thermal probe
IMPORTANT
: The proper positioning of the “RTD” thermal probe is essential to the proper
functioning of the furnace. Install it in the opening provided for this purpose on the start-off
plenum.
With the plenum extension (A) and the plenum (B)
With 6 self-taping screws
(D)
, install the metal
plate on the plenum
(B)
to block-off the 3 holes.
Make sure the notch
towards the bottom.
Install the RTP probe in
the plenum extension
(A).
Secure the RTD probe
with the two screws
provided
(C)
.
Connect the RTD probe
on the furnace with the
connection.
Summary of Contents for DF02001
Page 30: ...Tundra II Furnace Installation and Operation Manual 30 ...
Page 63: ...Tundra II Furnace Installation and Operation Manual 63 11 Exploded diagram and parts list ...
Page 64: ...Tundra II Furnace Installation and Operation Manual 64 ...
Page 65: ...Tundra II Furnace Installation and Operation Manual 65 ...
Page 66: ...Tundra II Furnace Installation and Operation Manual 66 ...
Page 67: ...Tundra II Furnace Installation and Operation Manual 67 ...
Page 73: ...Tundra II Furnace Installation and Operation Manual 73 12 2 1 Technical data Tundra II ...
Page 74: ...Tundra II Furnace Installation and Operation Manual 74 ...