Tundra II Furnace Installation and Operation Manual
24
5.3 Installation of the assembled plenum on the furnace
Identify the right side of the plenum, it is
provided with holes for the installation of the
“RTD” thermal probe.
Also, 5 holes are aligned with the fold of the
top of the furnace on the right side and
three holes on the other sides. This allows
you to secure the plenum properly.
Install the assembly on the furnace, taking
care to insert the 4 fold on top of the
furnace
inside
the plenum.
Using 14 screws, secure the plenum to the
furnace.
Summary of Contents for DF02001
Page 30: ...Tundra II Furnace Installation and Operation Manual 30 ...
Page 63: ...Tundra II Furnace Installation and Operation Manual 63 11 Exploded diagram and parts list ...
Page 64: ...Tundra II Furnace Installation and Operation Manual 64 ...
Page 65: ...Tundra II Furnace Installation and Operation Manual 65 ...
Page 66: ...Tundra II Furnace Installation and Operation Manual 66 ...
Page 67: ...Tundra II Furnace Installation and Operation Manual 67 ...
Page 73: ...Tundra II Furnace Installation and Operation Manual 73 12 2 1 Technical data Tundra II ...
Page 74: ...Tundra II Furnace Installation and Operation Manual 74 ...