SECTION 5
MAINTENANCE
Page 52
OM560C99/1E
DRESSTA
LOADER EQUIPMENT
To replace the bucket carry out as follows:
1. Park the machine on level ground or in the workshop.
2. Place the bucket in position as shown in Fig. 5.59.
3. Remove bolts 1 and tap pins 2 out.
4. Move away with the machine or lift the boom.
5. Protect disassembled O-rings 3 and 1.5 mm shims 4.
6. Reinstall the bucket in the reverse order.
IMPORTANT:
Allowable gap between bucket supports and boom arms is 1.5 mm. If gaps are
bigger, fill symmetrically with shims.
WARNING! When replacing the bucket take care. Disassembled heavy compo-
nents of loader linkage system (boom arms, connector) must be securely
protected against sudden movement.
Summary of Contents for 560C
Page 1: ...OM560C99 1E OPERATOR S MANUAL 560C SERIAL NUMBERS 15001 AND UP ...
Page 3: ......
Page 5: ......
Page 7: ......
Page 10: ...SECTION 1 INTRODUCTION ...
Page 12: ......
Page 16: ...SECTION 2 SAFETY PRECAUTIONS ...
Page 18: ......
Page 32: ...SECTION 3 MACHINE TRANSPORT AND STORAGE ...
Page 34: ......
Page 42: ...SECTION 4 OPERATING ...
Page 43: ......
Page 45: ......
Page 49: ...SECTION 4 OPERATING Page 6 OM560C99 1E DRESSTA UNIVERSAL SYMBOLS FOR INSTRUMENTS AND CONTROLS ...
Page 88: ...SECTION 5 MAINTENANCE ...
Page 141: ...SECTION 6 SPECIFICATIONS ...
Page 143: ......