33
manufacturer for
maintenance.
The method of replacing tube:unplug the water pipe connecting the ICP and the water
tank→Open the ICP back shell→Open the high-frequency box and gradually remove the parts
connected to the tube→After changing the tube, install it again→Reconnect the boiling water
pipe (note the water in and out)→Check if it leaks→Boot test
Summary of Contents for DW-TY-9900
Page 16: ...15 In the new method enter the method name The following window appears determined...
Page 17: ...16 OK displays the following window...
Page 19: ...18 attenuation measurement standards measure the sample Selection Method...
Page 21: ...20 Automatic peak search...
Page 24: ...23...
Page 25: ...24 After you finish testing the standard point of exit to save Test sample...