4
For Your Safety
Strictly follow the Instructions for Use
Any use of the Dräger Pump X-am 1/2/5000 requires full under-
standing and strict observation of these instructions. The pump may
only be used for the purposes specified here.
Maintenance
Repairs to the pump may only be carried out by trained service per-
sonnel. We recommend that a service contract be obtained with
Dräger Safety and that all repairs also be carried out by Dräger
Safety.
Only authentic Dräger spare parts may be used for maintenance.
Accessories
Only the accessories specified in these Instructions for Use may be
used.
Use in areas subject to explosion hazards
Devices or components for use in explosion-hazard areas which
have been tested and approved according to national, European or
international Explosion Protection Regulations may be used only
under the conditions explicitly specified in the approval and with con-
sideration of the relevant legal regulations. The equipment or compo-
nents may not be modified in any manner. The use of faulty or
incomplete parts is forbidden. The appropriate regulations must be
observed at all times when carrying out repairs on these devices or
components. Repairs to the device may only be carried out by
trained service personnel in accordance with the maintenance
instructions of Dräger Safety.
Liability for proper function or damage
The liability for the proper function of the device is irrevocably trans-
ferred to the owner or operator if the device is serviced or repaired
by personnel not employed by Dräger Safety or if the device is used
in a manner not conforming to its intended use.
Dräger Safety cannot be held responsible for damage caused by
non-compliance with the above recommendations.
The warranty and liability provisions of the terms of sale and delivery
of Dräger Safety are similarly not modified by the above recommen-
dations.
Intended Use
The Dräger Pump X-am 1/2/5000 is an external pump for the porta-
ble gas measuring devices Dräger X-am 1100, X-am 1700,
X-am 2000 and X-am 5000. It is ideally suited for short-term pump
operations as it is very easy to switch between pump and diffusion
mode.
It conveys air or non aggressive measured gases to inaccessible
places up to 30 m, such as in tunnels, shafts or tank farms.
What is What
Commissioning
For each start-up of the Dräger Pump 1/2/5000 use the filter since
otherwise the pump could suffer damage.
Insert batteries or charged NiMH rechargeable batteries:
●
Unscrew the filter in a counterclockwise direction.
●
Loosen the two screws at the front and remove the cap.
●
Insert the batteries or charged rechargeable batteries into the
holders. Ensure correct polarity!
●
Replace the cap and tighten the two screws.
●
Screw the filter in a clockwise rotation onto the device.
1
Release key
6
Filter
2
Device receptacle
7
Bat LED
3
Flow LED
8
Sealing cap
4
Complete cap
9
Carrying strap
5
Intake port
CAUTION:
Do not replace the batteries / rechargeable batteries in hazard-
ous areas. Danger of explosion!
Batteries / rechargeable batteries are part of the Ex approval.
Only the following types may be used:
— Alkaline batteries – T4 – (not rechargeable!)
Energizer No. E91, Energizer No. EN91 (Industrial), Varta
Type 4106 (power one) or Varta Type 4006
—
NiMH rechargeable batteries – T3 – (rechargeable)
GP 180AAHC (1800 mAh) max. 40
o
C ambient temperature.
CAUTION:
Do not throw used batteries into fire or try to open them by
force. Danger of explosion!
Dispose of the batteries in accordance with local regulations.
00
1
2389
7_03.eps
1
2
3
4
9
7
8
6
5
Operation
Next: Pump test prompt:
If the test was successful:
If the test was unsuccessful:
Performing the measurement
●
●
Perform the measurement according to the Instructions for Use of
the gas measuring device.
●
Switch on the gas measuring device and in-
sert into the device receptacle of the pump.
●
Press the gas measuring device down-
wards causing it to slide forwards. The de-
vice receptacle must click into position.
— The pump is automatically switched on
— The two LEDs light green shortly and then
red, accompanied by a signal tone.
— The flow LED flashes yellow, accompanied
by a signal tone.
●
Block the intake port for approx. 2 seconds.
— The flow LED flashes red, accompanied by
a continuous signal tone.
●
Unblock the intake port again.
— The flow LED lights green, accompanied by
an acknowledgment tone.
— The flow LED flashes red, accompanied by
a continuous tone.
— The pump is automatically switched off.
●
Remedy: see “Displays, Alarms, Remedies”
on page 5.
0022389
7
_03.eps
0032389
7
_03.eps
Flow
Bat
Pump X-am 1/2/5000
D
0042389
7
_03.eps
Flow
Bat
Pump X-am 1/2/5000
D
0052389
7
_03.eps
Flow
Bat
Pump X-am 1/2/5000
D
OK
0062389
7
_03.eps
Flow
Bat
Pump X-am 1/2/5000
D
Summary of Contents for 83 19 400
Page 47: ...47...