Ceiling and wall attachment
Dr. Mach
Lamps and Engineering
List of contents
1. Mounting layout ceiling attachment .......................................................................... Page 6
2. Ceiling attachment.................................................................................................... Page 7
2.1 Preparatory work on the ceiling ......................................................................... Page 7
2.1.1 Setting the safety dowels .......................................................................... Page 7
2.1.2 Mounting the ceiling anchorage ring
to the solid ceiling ...................................................................................... Page 7
2.2 Pre-mounting of the ceiling flange and suspension tube ................................... Page 8
2.2.1 Aluminium cast flange and suspension tube
∅
50mm.............................. Page 8
2.2.2 Flange tube
∅
70mm and suspension tube
∅
50mm ............................... Page 9
2.2.3 Light-weighted central axis
(connection which can turn through 360°) ................................................. Page 10
2.2.4 Ceiling attachments and room heights...................................................... Page 11
2.3 Mounting the flange and suspension tube to the ceiling.................................... Page 13
3. Mounting layout wall attachment .............................................................................. Page 15
4. Wall attachment........................................................................................................ Page 16
4.1 Preparatory work on the wall ............................................................................. Page 16
4.2 Mounting the wall bearing.................................................................................. Page 17
4.2.1 Wall attachment, room heights.................................................................. Page 18
4.3 Installing the extension arm stop (surcharge).................................................... Page 19
5. Electrical connection ................................................................................................ Page 20
5.1 Preparing the electrical connection.................................................................... Page 21
5.2 Electrical connection for lamps with external transformer ................................. Page 21
5.2.1 Ceiling lamps with external transformer .................................................... Page 21
5.2.2 Wall lamps with external transformer ........................................................ Page 22
5.2.3 Lamps with regulating transformer............................................................ Page 23
5.3 Wiring diagrams................................................................................................. Page 24
6. Mounting the articulated arms .................................................................................. Page 25
6.1 Ceiling attachment ............................................................................................. Page 25
6.1.1 Mounting the extension arm...................................................................... Page 25
6.1.2 Removing the lateral covering plates ........................................................ Page 25
6.1.3 Electrical connection ................................................................................. Page 26
6.2 Wall attachment ................................................................................................. Page 27
6.3 Mounting the spring arms .................................................................................. Page 27
6.3.1 Mounting the standard spring arm ............................................................ Page 27
6.3.2 Mounting the Space spring arm ................................................................ Page 28
6.3.3 Mounting the central spring arm................................................................ Page 29
7. Mounting the lamp / the end device ......................................................................... Page 30
7.1 Mounting at the standard spring arm ................................................................. Page 30
7.2 Mounting at the Space spring arm..................................................................... Page 32
7.3 Mounting at the central spring arm .................................................................... Page 33
8. Adjusting the mobility ............................................................................................... Page 35
8.1 Adjusting the mobility at the ceiling attachment................................................. Page 35
8.2 Adjusting the spring force .................................................................................. Page 36
8.2.1 Standard-spring arm ................................................................................. Page 36
8.2.2 Space spring arm ...................................................................................... Page 37
8.2.3 Central spring arm..................................................................................... Page 37
59500001
Edition 06
11.03.2003 / Bak Page 3/48