Mach LED 150F / 150 / 150FP
59320002
Edition 12
08.08.2018 / Bak We page 14/26
5.
Initial operation and Maintenance
Preventive maintenance of the light must take place every two years. This includes a technical and
mechanical check-up.
Please observe also the mounting instructions and instructions for the carrying systems. These
instructions can contain statements for different maintenance intervals.
Basis of the examination of the lighting and load-bearing systems forms the DGV V3 (formerly BGV-A3)
in connection with the EN 62353.
Attention:
Set the height adjustment, if applicable, of the spring arm to horizontal position before dismount-
ing the lamp. Please observe also the mounting instructions and instructions for the carrying
systems.
Attention: During all maintenance work the light must be disconnected from mains and
secured against resetting.
5.1 Activity at initial operation and maintenance work
The following maintenance work / tests has / have to be done:
•
check on defects in paint work;
•
check on fissures at plastic parts;
•
check on deformation of the suspension.
•
check on loosened parts;
•
check the connection between light and carrying system;
•
check and grease the securing segment;
•
check the faultless function of the light;
•
perform the electrical safety tests
For adjustments at the ceiling attachment please observe also the mounting instructions “
Ceiling
attachment with heavy central axis
” or “
Ceiling attachment – wall attachment
” from Dr. Mach.
Remark:
Wiring diagrams, complete spare parts lists and maintenance manuals can be provided on
request.
It is not allowed to exchange spare parts and make repair work while the light is in operation.
It is not allowed to touch parts below the housing cover and to touch the patient at the same time.