Number 1 button.
Number 2 button.
Number 3 button.
Number 4 button.
Current system status.
The time remaining until next testing.
The last pH value obtained by the KHG.
The last dKH value obtained by the KHG.
When installing KHG, please ensure the KHG is placed on level ground and is completely upright (Figure
4). At least a construction grade levelling tool must be used to make sure the placement of KHG is level on
the X, Y, and Z axis. Complete levelling is crucial as to keep the sodium bicarbonate solution from dripping
on the optical and electronical components before entering the reactor chamber. KHG will fail if solutions
contaminates the optical and electronics.
1
5
7
8
2
6
3 4
Page 2
2.
1
2
3
4
5
6
7
8
KHG display panel
1.
(Figure 3)
User Manual
Quick Install
(Figure 2)
DC 12V Power
LCD Display Panel
pH Probe
Water Form Tank
Purge to Tank
Reagent Solution
Sodium Bicarbonate
Ethernet (RJ45)
1
6
8
7
2
3
5
4
KRS
S.W IN
S.W OUT
S.S IN
S.S OUT