l
The last cable tie should be just above where the cable will enter the pedestal where the Cable Gland
was installed.
3.2.3.2 Cable Routing Inside the Pole
1. Drill an Entry Port in the Pole Cap. Install the cap in the top of the pole.
2. Drill an Exit Port in the pole so the cable can be put through the pole.
NOTE:
Make sure these holes are large enough to accommodate the SMA cable connector.
3. Put the SMA connector end of the cable through the top of the pole and through the Exit Port.
4. Use a silicone sealant to seal the Entry Port in the cap in the top of the pole and the Exit Port after the
connections are made.
3.3 Complete the Installation
1. Install the cable through the Cable Gland.
2. Connect the SMA connector to the Antenna Connector of the AVI board in the terminal.
3. Connect the 20-1732 terminal connections to the J1 Terminal Block of the VIS board. Connect the 4-
Pin Molex connector to an open Power Supply connector.
Installation Manual - Revision: 0 - DRAFT | Dover Fueling Solutions
23