![Dorner iDrive 3200 Series Installation, Maintenance & Parts Manual Download Page 22](http://html1.mh-extra.com/html/dorner/idrive-3200-series/idrive-3200-series_installation-maintenance-and-parts-manual_2523202022.webp)
Dorner Mfg. Corp.
22
851-702 Rev. A
3200 Series iDrive Belt Conveyors
Preventive Maintenance and Adjustment
Circuit Board Removal and
Replacement
1. Remove belt. (See “Belt Removal for Conveyor Without
Stands” on page 13 or “Belt Removal for Conveyor
With Stands” on page 13.)
2. Remove wear plate
by removing
plate fastening screws
on each side
and end of conveyor
Figure 66
Figure 66
3. Disconnect two wiring harness connectors
67, item 1)
from motor connector
and switch wiring connector
.
Figure 67
Figure 67
4. Remove hex head screw
, and loosen
hex head screw
. Remove circuit
board
from conveyor frame.
Figure 68
Figure 68
5. Replace circuit board.
6. Reinstall in reverse order of removal.
A
WARNING
Exposed moving parts can cause severe
injury. LOCK OUT POWER before removing
guards or performing maintenance.
1
2
NOTE
Make sure the cord or wires are not across
the circuit board when reassembling. Tuck
wires and cable into the frame extrusion.
3
2
1
2
1
3