68
Crane 4000LE
07-2022
RL6002-001
Crane 4000LE Installation Manual
In-ground Motion Assist 360 drive and speed control
Remote control enclosure
Chapter 14
14.5 Place quarter post/end wall on base rails
14.5.1 Quarter post placement on base rails.
NOTICE
Refer to Crane shop drawings for quarter post
placement.
CAUTION
Place post based on post numbering.
Refer to Para. 12.9 for post numbering
locations.
WARNING
Use caution while working with the posts !
Fig. 14.5.1 Threaded rod
14.5.2 Install threaded rod into quarter post.
1. 1/4-20 x 2" threaded rod serves to align quarter post
with base.
2. Thread 1/4-20 by 2" threaded rod into bottom hole in
quarter post.
14.5.3 Place quarter post on base rails.
1. Raise quarter post vertically, place threaded rod into
floor bar and lower assembly onto floor bar.
1
2
Fig. 14.5.2 Quarter post with threaded rod
1
2
Ø1/4” clearance hole
3
Fig. 12.5.3 Quarter post above floor bar assembly
Fig. 14.5.4 Quarter post placed on floor bar assembly
Fig. 14.5.5 Center posts and quarter posts on floor bars
1
Table 14.5.1 Center post and hardware
1
RF6122-01G
1/4-20 x 2" threaded rod
2
RE6019-010
Quarter post
3
1" x 3/4" floor bar